Rio 2016 Olympic Games
Providing power for the opening and closing ceremonies, as well as 25 competition venues throughout the event.

Pulp Company
High-volume production industries need to meet their deadlines for opening new plants, as their planning already includes the production volumes expected from the launch.

Danone Alimentos
Install a supplementary power supply source for enhanced security at the refrigerated Distribution Center, the largest of the company in Brazil.

Pharmaceutical Industry
Prevent interruptions in processes requiring climate control during maintenance planning.

Odata Colocation
Temporary power supply during construction and testing phase at Data Center SP 01 in São Paulo

Mega Furniture and Decor Store
The client had an inefficient climate control system with chronic maintenance issues, which was not meeting the required thermal load.

Independent Wind Power Producer
Providing power for commissioning 80 wind turbines in the state of Rio Grande do Norte