NEED OF THE CLIENT

Temporary power supply during construction and testing phase at Data Center SP 01 in São Paulo.

Data centers must meet various standards in their structure, qualifying the construction as a sophisticated project. Therefore, players in this sector seek suppliers who can provide the highest level of technical competence, along with support and guidance at every stage.

SOLUTION TECNOGERA

Tecnogera was contracted to deliver different solutions throughout the project’s stages: initially, we provided power generators and equipment to support the structural phase of construction, meeting all necessary demands. After 7 months of work, we installed a power plant responsible for energy supply during the network adaptation period, allowing for up to a 1-month gain in testing and commissioning of the structure. This is crucial for data centers, as it allows testing of available power directly on racks and switchgears with real resistive and reactive loads, evaluating the efficiency of air flow dispersion systems, and calibrating energy distribution and control systems, saving resources during operation and its various demands. Our solution provided over 3MVA in power generators and 6000 MW in load banks, used during the testing phase of the data center, ensuring system stability and security of the installed equipment.

Business results

With Tecnogera’s involvement, Odata was able to construct their data center, test all energy demands to be used, and offer their services quickly and securely.